Kaiping 200MW Ground-Mounted Centralized Solar Power Station
This ground-mounted centralized solar reference project in Kaiping, Jiangmen, Guangdong, China demonstrates how a carefully engineered 200MW installation converts an unavoidable operating cost into a predictable, long-term saving.
Project Snapshot
| System Type | Ground-mounted Centralized Solar |
|---|---|
| Location | Kaiping, Jiangmen, Guangdong, China |
| Installed Capacity | 200MW |
| Annual Generation | 240,000,000 kWh |
| Annual Electricity Savings | 399,600,000,000 VND |
| Payback Period | 10 years |
| Annual CO2 Reduction | 160,000 tonnes |
Project Background and Objectives
At this scale, small engineering decisions compound into large financial outcomes. Module selection, tracker or fixed-tilt geometry, DC/AC ratio and cable routing were all optimised against the site's irradiance profile and grid-connection constraints to protect the investment case over a 25-year horizon.
Engineering Approach
Civil works were phased so that cabling trenching and pile driving did not overlap, which compressed the construction programme by roughly three weeks. Central inverters are housed in shaded containers with forced ventilation, and the MV step-up substation was designed with protection coordination studies completed before energisation. All DC string combiners are IP65 rated and mounted above the design flood level for the site.
Verified Results
- Annual clean generation of 240,000,000 kWh from the installed array.
- Grid electricity expenditure reduced by 399,600,000,000 VND every year.
- Carbon emissions cut by approximately 160,000 tonnes CO2 per year.
- Investment recovered within 10 years, with an expected service life of 25 years or more.
- Performance monitored remotely with string-level fault alerts and monthly yield reporting.
Why This Project Matters
Projects at this scale move the needle on national renewable targets, but their real value is measured in levelised cost and reliability. This plant shows that centralised solar in Vietnam can be engineered to utility standards, delivered on schedule and operated with transparent performance reporting - the three conditions institutional investors require before they commit capital to the sector.
About Hengyang New Energy
Hengyang New Energy Vietnam Company designs, engineers and delivers photovoltaic and energy storage systems for households, enterprises and public institutions across Vietnam and the wider region. From a 3 kW rooftop system to a 200 MW ground-mounted station, every project is supported by in-house structural and electrical engineering, grid-connection compliance management and lifetime performance monitoring.
If you would like a feasibility assessment, a yield forecast or a firm quotation for a site of your own, our engineering team can prepare a proposal within five working days.