Hotel Solar-Storage Integration Project in Nha Trang | C&I Solar + Storage Case Study and a 6-Year Payback
Hotel Solar-Storage Integration Project in Nha Trang
A 200kW solar + 100kWh energy storage integrated system installed at a hotel in Nha Trang, which not only saves electricity costs but also provides reliable power supply when the grid is unstable, improving the hotel's service quality.
Project Snapshot
| System Type | Commercial & Industrial PV + Storage |
|---|---|
| Location | Nha Trang |
| Installed Capacity | 200kW+100kWh |
| Annual Generation | 240,000 kWh |
| Annual Electricity Savings | 444,000,000 VND |
| Payback Period | 6 years |
| Annual CO2 Reduction | 160 tonnes |
Project Background and Objectives
Intermittent grid supply was costing this business far more than the energy tariff itself. The project was therefore engineered around two objectives: maximise daytime solar self-consumption, and hold enough stored energy to keep essential loads running seamlessly when the grid drops.
Engineering Approach
Design work began with a two-week load study that separated critical, deferrable and non-essential consumption. Battery capacity was then sized to cover the critical load for the required autonomy period plus evening peak shaving, and the inverter was selected with enough overload capability to start motor loads without derating. Thermal management of the battery enclosure was addressed explicitly, since sustained high ambient temperatures are the main cause of premature capacity loss in this climate.
Verified Results
- Annual clean generation of 240,000 kWh from the installed array.
- Grid electricity expenditure reduced by 444,000,000 VND every year.
- Carbon emissions cut by approximately 160 tonnes CO2 per year.
- Investment recovered within 6 years, with an expected service life of 25 years or more.
- Performance monitored remotely with string-level fault alerts and monthly yield reporting.
Why This Project Matters
Solar plus storage is the most practical answer to the two problems that dominate energy planning in Vietnam: rising tariffs and unreliable grid supply. This project proves that a single integrated system can cut energy cost, cap demand charges and keep critical operations running through outages - with one controller, one dashboard and one point of accountability for maintenance.
About Hengyang New Energy
Hengyang New Energy Vietnam Company designs, engineers and delivers photovoltaic and energy storage systems for households, enterprises and public institutions across Vietnam and the wider region. From a 3 kW rooftop system to a 200 MW ground-mounted station, every project is supported by in-house structural and electrical engineering, grid-connection compliance management and lifetime performance monitoring.
If you would like a feasibility assessment, a yield forecast or a firm quotation for a site of your own, our engineering team can prepare a proposal within five working days.