Latest company case about Dongguan Yongdeli 8MW | C&I Solar Case Study with 8MW Installed Capacity, 9,600,000 kWh Annual Yield

Dongguan Yongdeli 8MW | C&I Solar Case Study with 8MW Installed Capacity, 9,600,000 kWh Annual Yield

2026-11-15

Dongguan Yongdeli 8MW

This commercial & industrial pv reference project in Dongguan, Guangdong, China demonstrates how a carefully engineered 8MW installation converts an unavoidable operating cost into a predictable, long-term saving.

Project Snapshot

System TypeCommercial & Industrial PV
LocationDongguan, Guangdong, China
Installed Capacity8MW
Annual Generation9,600,000 kWh
Annual Electricity Savings17,760,000,000 VND
Payback Period5.4 years
Annual CO2 Reduction6,400 tonnes

Project Background and Objectives

This site operates around the clock, so the solar array had to be installed without any production downtime and without penetrating roof areas that were already at the end of their waterproofing life. Load profiles showed a strong daytime match with PV output, which made self-consumption the dominant value driver and kept the project clear of export limitations.

Engineering Approach

Because production could not stop, all electrical tie-in work was scheduled around shift changes and completed in staged isolations. The array was split into multiple MPPT zones to limit mismatch losses from the mixed roof heights, and DC string monitoring was included so that a single underperforming string can be identified remotely instead of through a site visit. Cable routes were planned to keep voltage drop below two percent across the longest runs.

Verified Results

  • Annual clean generation of 9,600,000 kWh from the installed array.
  • Grid electricity expenditure reduced by 17,760,000,000 VND every year.
  • Carbon emissions cut by approximately 6,400 tonnes CO2 per year.
  • Investment recovered within 5.4 years, with an expected service life of 25 years or more.
  • Performance monitored remotely with string-level fault alerts and monthly yield reporting.

Why This Project Matters

For commercial and industrial operators, rooftop PV is now the cheapest kilowatt-hour available - cheaper than the grid, cheaper than diesel back-up, and unaffected by tariff adjustments. This project shows how a well-engineered array can be installed on a live facility without disrupting output, and how the savings can be measured and reported with the rigour that international customers and auditors expect.

About Hengyang New Energy
Hengyang New Energy Vietnam Company designs, engineers and delivers photovoltaic and energy storage systems for households, enterprises and public institutions across Vietnam and the wider region. From a 3 kW rooftop system to a 200 MW ground-mounted station, every project is supported by in-house structural and electrical engineering, grid-connection compliance management and lifetime performance monitoring.

If you would like a feasibility assessment, a yield forecast or a firm quotation for a site of your own, our engineering team can prepare a proposal within five working days.