Commercial Building Solar Project in Ho Chi Minh City

A 500kW rooftop solar system installed at a commercial building in Ho Chi Minh City, with an average annual power generation of approximately 600,000 kWh, saving about 300,000 RMB in electricity costs per year and reducing carbon emissions by approximately 400 tons.

Project Snapshot

System TypeCommercial & Industrial PV
LocationHo Chi Minh City
Installed Capacity500kW
Annual Generation600,000 kWh
Annual Electricity Savings1,110,000,000 VND
Payback Period5 years
Annual CO2 Reduction400 tonnes

Project Background and Objectives

Electricity is one of the largest controllable costs for this facility, and the tariff structure - demand charges plus a rising energy rate - meant that every kilowatt-hour generated on the roof was worth considerably more than the headline price. The plant management team needed a system that would not interrupt production, would survive tropical monsoon loading, and would give verifiable monthly savings data for their ESG reporting.

Engineering Approach

Our scope covered structural verification of the existing roof, array layout optimisation against the plant's load profile, and full electrical integration at the low-voltage main switchboard. Modules were mounted on elevated rails to preserve roof access and drainage, with walkways and fall-protection anchor points integrated into the layout. The AC side uses a reverse-power-protection relay and a dedicated generation meter so that every kilowatt-hour is measured and reported, and the plant SCADA dashboard exposes live yield, performance ratio and avoided-cost figures to the facility team.

Verified Results

  • Annual clean generation of 600,000 kWh from the installed array.
  • Grid electricity expenditure reduced by 1,110,000,000 VND every year.
  • Carbon emissions cut by approximately 400 tonnes CO2 per year.
  • Investment recovered within 5 years, with an expected service life of 25 years or more.
  • Performance monitored remotely with string-level fault alerts and monthly yield reporting.

Why This Project Matters

For commercial and industrial operators, rooftop PV is now the cheapest kilowatt-hour available - cheaper than the grid, cheaper than diesel back-up, and unaffected by tariff adjustments. This project shows how a well-engineered array can be installed on a live facility without disrupting output, and how the savings can be measured and reported with the rigour that international customers and auditors expect.

About Hengyang New Energy
Hengyang New Energy Vietnam Company designs, engineers and delivers photovoltaic and energy storage systems for households, enterprises and public institutions across Vietnam and the wider region. From a 3 kW rooftop system to a 200 MW ground-mounted station, every project is supported by in-house structural and electrical engineering, grid-connection compliance management and lifetime performance monitoring.

If you would like a feasibility assessment, a yield forecast or a firm quotation for a site of your own, our engineering team can prepare a proposal within five working days.